CAP Science Laboratory


CAP Science Lab Retrocommissioning

Cap Science Laboratory
Appalachian State University
Boone, NC

Size of project: 114,000 SF

Project Description:

System WorCx was hired to perform existing building commissioning (retrocommissioning) on this building.  The building was identified as a candidate for commissioning due to very high energy usage, and historical problems with heating, cooling, and ventilation.

The project energy-related systems included:

  • Building Automation System.
  • Laboratory Airflow Controls.
  • Chiller/Cooling Tower.
  • Steam system connected to campus distribution system.
  • Air Handling Units.
  • Fume Hood Exhaust and Heat Recovery.
  • Domestic Hot Water.
  • Lighting.
  • Utility Metering

 

<< Click to go back